We bring extensive experience in the design of healthcare facilities and of high-energy cyclotron equipment, and an understanding of its unique challenges, such as the routing of electrical conduits and interaction with the radiation shielding design. On this project, our team provided HVAC, electrical controls, piping and device embeds for the cyclotron, proton beam line installation and proton treatment systems, including coordination of services with the radiation shielding, meeting the complex servicing requirements of the equipment vendor and overseeing the interfaces with clinical services and the wider patient experience.
Providing PBT equipment entry and egress is vitally important to minimize disruption not only to the site but to adjacent areas as well. We are working closely with the system manufacturer and Bouygues UK our client, and phase plans will be developed and tested virtually using a shared BIM platform and 4D planning software.